DIARY (TMS)

DIARY PRJECT MANAGEMENT SYSTEM © Copyright Geo-Pioneers Ltd.


Data flow diagram (DFD0)

The system is designed for contractors, who daily need to follow up their subcontractors and advertisers reports and activities. The point is that in long term projects, the risk rate is higher than usual, and contractors are always fighting to detect errors the earliest possible.

in simple words, each system user fills his part, allowing the parent level contractor to follow projects day by day. 

Design Consideration:

  • The system is  designed to support a large number of users and projects. 
  • Custom defined calendar (holidays)
  • Squired and protected.
  • Choosing the correct server specification to corresponds  with the minimum requirement for each client 
  • We do not develop a weal if it exists, so we choose the ASP.NET valuators and components, Following in this case, Microsoft instruction and standards.

Leave a Reply

Your email address will not be published. Required fields are marked *